by Stephanie Wilocki | Aug 18, 2015 |
Carlton at Lake Project Description This is a 244 bed nursing home facility in which Jolen Electric has updated the entire Fire Alarm system, and performs ongoing maintenance work for the fire alarm and nurse call systems. Project Details Contractor – Carlton at Lake Date – Ongoing maintenance work Lists and Professional Credentials A City of Chicago WBE Contractor Serving Chicagoland and Northern Indiana A Valued Construction Partner or Design/Build Contractor View Project List...
by Stephanie Wilocki | Jun 23, 2015 |
Victory Center of River Woods – Interior Remodel Project Description Victory Centre of River Woods is a Pathway Senior Living community. It features 107 apartment supportive living community for adults 65 and older, located at 1800 Riverwoods Drive in Melrose Park, Illinois less than 15 miles from downtown Chicago. Jolen Electric was contracted to complete the interior remodel of the main lobby as well as converting two units on the 3rd floor to physical therapy and patient team rooms. Victory Centre of River Woods was originally constructed by JJ Duffy Construction in the early 1990’s, and Jolen Electric was the Electrical Contractor during the original construction. Project Details Contractor Skender Construction, LLC Completion Date Summer 2015 Lists and Professional Credentials A City of Chicago WBE Contractor Serving Chicagoland and Northern Indiana A Valued Construction Partner or Design/Build Contractor View Project List...
by Stephanie Wilocki | Jun 23, 2015 |
The Clare – 1st and 53rd Floor Remodels The Clare Lounge Lounge Project Description The Clare is a senior living community located at 55 E. Pearson St., Chicago, IL 60611 Senior Care Types Provided: Assisted Living, Continuing Care, Independent Living, Respite Care-Short Term Stay, 62+ Lifestyles Jolen Electric was contracted to do the remodel of the 1st floor Main Entrance Lobby, 53rd Floor Lounge, and the conversion of the Discover Center into a Sales and Signing room. The contract included the following work. Power Lighting Low Voltage All Wiring will be removed back to the IT Closet that serves, Per Code Fire Alarm Simplex System to remove any un-needed devices from the system programming to alleviate nuisance trouble calls. CCTV System All Cameras to be removed and stored on site for future use Access Control System All Devices to be removed and stored on site for future use Distribution Panel: New 3 Phase 100a 277/480v breaker to be installed in existing 54 – HDP -1 panel, for New 75kw transformer. New 75kw Transformer and Feed per one line drawing New 200a 3 Phase 120/208 KP panel to be added per one line All Grounding to be brought back to Grounding Junction Box in Electrical room 5404 A 100a 3 Phase 277/480v feed will be ran from 54-HDP-1 to MAU on roof. No information given for MAU size. Project Details Contractor Novak Construction, LLC Date Date of Completion Lists and Professional Credentials A City of Chicago WBE Contractor Serving Chicagoland and Northern Indiana A Valued Construction Partner or Design/Build Contractor View Project List...
by Stephanie Wilocki | Jun 23, 2015 |
Norwood Crossing Project Norwood Project Description This project was a 4 story addition and addition of a sunroom onto an existing senior living facility. All new lighting, power lighting and low voltage feeds were installed. Project Details Contractor Pepper Construction Group, LLC Date Date of Completion Lists and Professional Credentials A City of Chicago WBE Contractor Serving Chicagoland and Northern Indiana A Valued Construction Partner or Design/Build Contractor View Project List...
by Stephanie Wilocki | Jun 23, 2015 |
MLK Apartments Project Description Jolen Electric was contracted to do a building refresh. This included the installation of new fixtures and devices in each living space. Project Details Contractor Skender Construction, LLC Date Date of Completion Lorem ipsum dolor sit amet, consectetur adipiscing elit. Aliquam imperdiet, metus id tincidunt rutrum, nunc dolor rutrum nulla, eget convallis erat arcu at sapien. Suspendisse et tellus dolor. Maecenas pellentesque scelerisque nunc, vel dictum enim porta vitae. Quisque quis diam diam. Brad Larson Technology Director, Waterfall Media Lists and Professional Credentials A City of Chicago WBE Contractor Serving Chicagoland and Northern Indiana A Valued Construction Partner or Design/Build Contractor View Project List...